Below is information about an incoming street renewal project utilizing Asphalt-Rubber Cape Seal in the West Adams neighborhood scheduled from March 18th to March 22, 2024. 

What is an Asphalt-Rubber Cape Seal?

An Asphalt-Rubber Cape Seal is a pavement treatment designed to extend the life of your street. It uses a special rubberized binder that offers several advantages:

  • Increased Strength and Flexibility: This reduces cracking and improves resistance to future damage.

  • Waterproof Seal: Protects the existing pavement from water infiltration.

  • Extended Lifespan: Provides a new wearing surface for the road, lasting over 10 years.

Please note: While the ride quality won’t significantly improve, this treatment is necessary to address existing cracks and prevent further deterioration.

How will this project affect you?

  • Parking Restrictions: “No Stopping Anytime” signs will be posted 72 hours prior to construction. Parked vehicles will be towed at the owner’s expense. Please move your car beforehand if needed.

  • Special Needs: Contact the City in advance to discuss any accommodations required.

  • Trash and Recycling: Collection will continue as usual. The contractor will coordinate with the crews to ensure minimal disruption.

  • Street Access: Expect temporary lane closures and delays. Utilize alternate routes or transportation whenever possible.

  • Resident Access: Residents will not be allowed on the street during construction and curing of the new pavement.

  • Traffic Flow: Once cured, local traffic will resume at slow speeds. Driveways to businesses and shopping centers will remain accessible, except during works directly in front.

Important Reminders:

  • Do not wash cars or water lawns 24 hours before and during construction to avoid damaging the new surface.

  • Obey all posted construction signs and traffic control measures.

Locations & Dates 

STREET 
FROM 
TO 
DATE 

CLYDE AVE.

120’ S/O ADAMS BLVD. 

SMILEY DR. 

3/18/2024 

DUNSMUIR AVE. 

COLISEUM ST. 

SANCHEZ DR. 

3/18/2024 

EXPOSITION BLVD./ S SERV RD. 

WELLINGTON RD.

VIRGINIA RD.

3/18/2024 

HEPBURN AVE. 

39TH ST. 

MARTIN LUTHER KING, JR. BLVD. 

3/18/2024 

WELLINGTON RD. 

WASHINGTON BLVD. 

23RD ST. 

3/18/2024 

COCHRAN AVE. 

EXPOSITION BLVD. 

DUNSMUIR AVE.

3/19/2024 

SMILEY DR. 

THURMAN AVE. 

SPAULDING AVE. 

3/19/2024 

SUNLIGHT PL. 

SYCAMORE AVE. 

ALSACE AVE. 

3/19/2024 

EXPOSITION BLVD./S SERV RD. 

SOMERSET DR. 

WELLINGTON RD. 

3/19/2024 

WELLINGTON RD. 

VICTORIA AVE. 

ADAMS BLVD. 

3/19/2024 

29TH ST. 

BUCKINGHAM RD. 

WEST BLVD. 

3/19/2024 

HALM AVE. 

CATTARAUGUS AVE. 

VENICE BLVD. 

3/20/2024 

VERA AVE. 

REGENT ST. 

VENICE BLVD. 

3/20/2024 

DUNSMUIR AVE. 

20TH ST. 

21ST ST. 

3/20/2024 

DUNSMUIR AVE. 

D/E N/O

WASHINGTON BLVD. 

3/20/2024 

APPLE ST. 

CLOVERDALE AVE. 

COCHRAN AVE. 

3/20/2024 

DUNSMUIR AVE. 

BANGOR ST. 

APPLE ST. 

3/20/2024 

21ST ST. 

WEST VIEW ST. 

LONGWOOD AVE. 

3/21/2024 

23RD ST. VICTORIA AVE. 

VICTORIA AVE. 

WELLINGTON RD. 

3/21/2024 

3RD AVE. 

OBAMA BLVD. 

N. OF @3853

3/22/2024 

7TH AVE. 

JEFFERSON BLVD. 

36TH ST. 

3/22/2024 

10TH AVE. 

MONTCLAIR ST. 

30TH ST. 

3/22/2024 

30TH ST. 

8TH AVE. 

9TH AVE. 

3/22/2024 

3RD AVE. 

S. OF @3947

MARTIN LUTHER KING, JR. BLVD. 

3/22/2024 

8TH AVE. 

JEFFERSON BLVD. 

36TH ST. 

3/22/2024